Answer Posted / surender saini
PPM Schedule is prepared according to the activity code of the equipments
Because ppm is done on daily monthly & Quartley basis
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
why is a power transformer used only occasionally?it is used to step up at generating stations?and that needs to be done all day long !!!!!!!
What will happen to the protection and metering, if the polarity of a single or two PT/PTs in three phase system is reversed? Please provide reference if any.
placing earthing pit in pathway is correct or wrong??. placing earthing wireGI1/18 inside walls is correct or wrong?. explain!!!
How to know the following data of synchronous generator 1. D-Axis Unsaturated Reactance 2. D-Axis Unsaturated Transient Reactance 3. D-Axis Unsaturated Sub - Transient Reactance
USE OF 8 WAY PAN ASSEMBLY
What safety precaution are to be taken for avoiding electric hazards ?
I want to design a heating coil of 80/20 nicrome for 3.5KW please give me the calculations choosing for physical dimensions assume coil voltage will be 110V AC assume necessary conditions
How to calibrate or test an LT Air Circuit breaker 440 volts, 35 KA, 800 Amps ?
either water sensor or flow meter,how we observe the water level, f any other equipment are in market ?
i have flexible wire. size of conductors is 0.190 mm & no.of conductors are 48. then size of wire comes 1.37 sqmm instead of 1.5 sqmm . the what is tolerance for this size.
pls tell me function of closing coil of A.C.B.
How many types of electrical earthing are there?
How servo stabilizer works.
What are the different types of dams?
1)What is a Triode? What are its uses? 2) What is a Triac? 3) What is a Thyristor?