how material can be calculate for brick work in 1:6
Answer Posted / ajay kumar sharma
1 tagari cement and 6tagari sand
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
in 100 cft = 1350 bricks in 100 cft = ? bloks
What is difference between engineering stress and true stress?
I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations
what are the types of design? which type of method is used at what type of design & why?
PL.tell me about civil engineering questions with answer
Define What is made from large rocks, which protects the base of cliffs?
why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure
What are the applications of the modulus of elasticity?
Pls explain me about tension and compression in a flat slab
how to calculate the material from ratio of work PCC, RRM,POINTING, RCC
what is Short bored pile foundation.
how to nfind out the specific gravity of sand.aggregate,water please help...
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
What is the cost difference between site mix and ready mix concrete per cubic meter
how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building