what is diffence in grade 43 & 53 of cement?

Answer Posted / mike

43 and 53 denote the compressive strength of cement after 28 days in mega pascals(mpa). 53 grade cement is used where early strength is required as in RCC structures, mortars grouts etc. whereas 43 grade is required where early strength is not the criteria as in plastering, brick work, pathways etc. Also 53 grade due to high heat of hydration requires more curing than 43 grade cement.

Is This Answer Correct ?    2 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are wooden shingles?

809


How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)

1518


What is M40 _ TOR - EQ and B.F.S

2029


what radial pressure, the NP2 class rcc pipe can sustain?

2896


What are the advantages of cad software’s?

684






Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––

1810


I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

1649


What will you do if you encounter problems like accidents?

617


Would you cause a 55-gallon drum of water to weigh more by climbing in?

679


in a corner footing of a building, column lies in one corner. in this condition i want to know if the reactive pressure of soil will be uniformly distributed throughout the footing or will be uniformly varying as in the case of eccentrical loading.

1730


What Are The Different Type Of Slump Test Indications?

823


I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.

1594


a concrete mix 1 2 4 by volume with water cement ratio as .6 by weight if moisture content in F.A is 6% with 20% BULKING AND IN C.A 1.5% by volume. find quantities of different materials required for one bag of cement

1666


What is labor and material payment bond?

641


I am practising engineer. I am searching for tutorial of RCC T Girder design Example in staad pro.Do anybody has this?please help