Answer Posted / ankur rana
To fill the gap, for good bonding
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
sir please send me campus placement questions in civil engineering
What is difference between engineering stress and true stress?
Explain creep?
how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?
what is the venturi effect in buildings? what is green house concept?different types of dams? which dam is economical arch dam or gravity dam. what are the conditions favourible to both of them?
Why should you consider yourself fit to be hired by jindal steel.
How to test cement,sand,20mmbluemetal,40mmbluemetal,bricks,concrete by visual and instrument
what is the max. area can we apply the plate load test ?
What is labor and material payment bond?
how clculate excavated or backfilling quantity by simpson's rule
What is unit weight of normal concrete?
In which code the the maximum height of concrete casting has been explained
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
sir tell me the formula for calculating the volume of 380mm dia double under reamed pile of 4.0 mts depth.
Define What is the meaning of a blue land surveyors flag?