Answer Posted / akram
L/B value is = more than 2 then these slab is Called as one way slab. in this slab the main Reinforcement will be providing in one direction.
L/B value is = Less than 2 then these slab is Called as two way slab. in this slab the main Reinforcement will be providing in both directions.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Define What glue is least sticky?
insted of bentonite we can use any alternate material in piling ?
what is differences between ferrock and concrete ?
What are the Types Of DPC and its Thickness used?
what is the soil bearing capacity for a 5 floor multistorey residential building and which type of soil ? what is plinth beam? in wall load calculation center to center column distance is considered or not/
how find the cut length of tringular ring and any formula find out the quantity of circular brick work
which is the cheapest type of flooring (say for using for 6 months in a factory building & dismantling it)?
Why are steel plates inserted inside bearings in elastomeric bearings?
What are new methods /technologies of pothole patching?
Why Vitrified tile are getting pop up.
hi guys what happens if you are absent for a supplymentry exam?
How many cement sand ballast in cc 1:4:8 40mm
What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m
Which tests are performed on soil to decide the type of foundation to be provided.
what is your role of in previous company as a construction manager