how to calculate 1:2:4 ratio concrete cement, sand, metal
and water please give me brief calculation
Answer Posted / vinod
45*15 feet construction so require cement
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
List out some of the software used in the construction sector to estimate cost and monitoring expenses?
How much does it cost for a R.C.C cover slab of size (450mmX 600mmx 100mm) double rf net given in feets using hand mix concrete?
What are your goals?
which has high compressive strength between hollow block and brick masonry?
what is stressing
how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?
what is spacing of wallar support of 3m column. the thickness of column is 0.25 m.
What is the use of mirror command?
Write short note on construction programme for pile foundation.
as per is code, what is the minimum content of opc and ppc cement for rcc structure
What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.
Special thing in designing a overhead reservoir ? which is different from an ordinary design
What is componsation
Stringer How many cm goes to landind
Explain why concrete barriers have curved surface profiles?