In Fe415 & Fe500,What is mean by "Fe" and "415/500"?
Answer Posted / arindam ghosh
FE 415/500 or 600 represents the Yield Stress of the Bar.This is the Yield limit of the Bar(Mild or HYSD). The Load applied per Square unit of area of the Bar(Example: 500 N/Square MM)and the Bar tends to bend or Yield.
| Is This Answer Correct ? | 12 Yes | 3 No |
Post New Answer View All Answers
what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?
Define What are the reasons for geotechnical site investigations in Uganda?
What are advancements in civil engineering?
how much cost of single coat 20mm thick plastering per sqre meter
que.is ideal size of bricnk use in india,joint size of mortar in massinary ,how many bricks used in 1cum.how to test at site.what is the possition of marka used in bricks?
how calculate the bearing from two coordinates?
punj loyed and sapurjl palanjl
flow of fluid takes place viscosity compressibilityu surface tension deformation under shear force
how much required strength of cement concrete bricks(size 230x115x75mm)
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
What is bmc stands for in bmc software?
In cement making,what is meaning of blend,fineness,density.
How to Rectify deep crack formed on Brick Wall? Explain the method of rectify the defect?
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
do we decide reinforcement steel , based on bending moment ? give example with continous slab?