In Fe415 & Fe500,What is mean by "Fe" and "415/500"?
Answer Posted / arindam ghosh
FE 415/500 or 600 represents the Yield Stress of the Bar.This is the Yield limit of the Bar(Mild or HYSD). The Load applied per Square unit of area of the Bar(Example: 500 N/Square MM)and the Bar tends to bend or Yield.
Is This Answer Correct ? | 12 Yes | 3 No |
Post New Answer View All Answers
resins are not soluble in water soluble in spirit used in varnish left behind on evoporation of oil
How much for the BRC lapping in full yield and half yield < and which table to get it ?
can we make bricks using m10 grade cement concrete and what would be the ratio of raw materials used and price per brick ?
Material calculation of cm 1:6 for 1sqm
VAT and CST ? Which benefits for buyer ? Why benefits?
Explain what is the difference between built area and super built up area?
Which is the most prominent tower of world?
what r the precaution for high in atp tempareture,low in atp tempareture
contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?
5. Do you feel that your present employer estimates your full work potential? Are they pleased with your work performance?
WHAT DLC DESIGN IN CONSTRUCTION
Basic questions of civil engineering
What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.
from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar
why demand factor less then 1 ?