In Fe415 & Fe500,What is mean by "Fe" and "415/500"?

Answer Posted / arindam ghosh

FE 415/500 or 600 represents the Yield Stress of the Bar.This is the Yield limit of the Bar(Mild or HYSD). The Load applied per Square unit of area of the Bar(Example: 500 N/Square MM)and the Bar tends to bend or Yield.

Is This Answer Correct ?    12 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

resins are not soluble in water soluble in spirit used in varnish left behind on evoporation of oil

2192


How much for the BRC lapping in full yield and half yield < and which table to get it ?

2034


can we make bricks using m10 grade cement concrete and what would be the ratio of raw materials used and price per brick ?

2071


Material calculation of cm 1:6 for 1sqm

1507


VAT and CST ? Which benefits for buyer ? Why benefits?

1405






Explain what is the difference between built area and super built up area?

699


Which is the most prominent tower of world?

635


what r the precaution for high in atp tempareture,low in atp tempareture

1599


contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?

1899


5. Do you feel that your present employer estimates your full work potential? Are they pleased with your work performance?

8493


WHAT DLC DESIGN IN CONSTRUCTION

1652


Basic questions of civil engineering

1622


What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.

2143


from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar

4162


why demand factor less then 1 ?

1775