Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Can we use 16mm dia bar in place of 12mm dia bar in COLUMNS? (if given dia bar is not available on site)

Answer Posted / azhar

If structure is G floor means we can us 12 mm bar but structural is more then G+ means we can't used 12 mm bar

Is This Answer Correct ?    9 Yes 8 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????

2001


how to convert sand in Cft to Kgs

1906


percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters

2112


for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.

1983


How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?

1813


how calucate cement sand ratio for plstering

1937


What is bylayer?

1123


i am completed my b.tech EEE in 2009,,,iam trying the job 3+ for AUTO CAD (ELECTRICAL),, what is the market for autocad electrical in hyderabad... how to handle the intervws give some suggestions ?

1949


the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C

2034


why we create short columns under grade slab?

2281


How to arrive d*d/162 , for finding the kg per meter , wt of steel

1838


in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh

2241


Define a polyline?

1197


Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)

5017


At one time what is the height of Lift for concreting for Bridge Piers Class B Loading and refer the code.

2159