what is the condition of transformer parallel operation ?
Answer Posted / medroua
Mandatory conditions:
Same phase angle shift, Same polarity, Same phase sequence and same frequency.
Convenient conditions:
Same voltage ratio & Turns Ratio, Same Percentage Impedance, Same KVA Rating, Same Position of Tap changer if any.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
How do you consider that you can improve and what assistance do you need to achieve this
How We Calibrate the vaccum transmitter?
What is difference between secondary Air & Tertiary Air and Their use.?
what's the moog valve
We have Demin Closed cooling water system with expansion tank for cooling oil system. Expansion tank having N2 bladder. Whenever N2 bladder bursts out, Closed cooling water circuit pressure drops and make-up happening, eventhough there is no leaks. And how Circuit pressure drops?
LAPT working in alternator / generator
how to differentiate between "ALL fuel lost" and "All Fuel Lost" in Boiler MFT condition?
dear sir i have completed one year post diploma certificate in thermal power engineering from national power training institute durgapur ...plz suggest me for power sector job
what is the meaning of SST300 V56A in SIEMENS turbine
By any way can we increase the B check hours from 300 to 500
DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.
what is the difference between compensated & normal drum level in boiler drum?
some one can tell me how residual type excitation is provided through transformers to an AC generator without any battery or PMG&excitor
can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525
Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon