1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement
Required? Brick Size 9" 4.5" 3"
Answer Posted / md.ali
Brick size: 9"X4.5"X3"--->convert to meters: 0.23X0.115X0.075
For No of Bricks = 0.75/(0.23X0.115X0.075)
= 378.09 No's
Cement =(dry materialXcement proportion)/sum of prop
=(0.35*1)/7
=0.05*1440
=72 kgs
sand =(dry material* sand proportion)/sum of prop
=(0.35*6)/7
=0.3*1850
=555 kgs or 0.555 tons
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
How are freeway bridges built?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting?
What are the different approaches in designing the floors of the service reservoirs?
how can can column be corrected when the design is not safe ? is the increasing the clearcover a solution?
The largest size of paper used in plotter to print the drawing made by Autocad .
How will you Engage Labours on Site?
which method is used in semi-rigid connection design??
What is Refuse Area In High Rise Building ?
What is binding spacing of the rebars at lapping zones.
For Wet Mix Mecadam design what is Optimum moisture content
which software is better for design and analysis of buildings (stadd pro ) or (Etabs)
How do you calculate the unit weight of concrete?
How many days should curing of plastering, brick work and concrete
Curing time for 1)R.C.C slab 2)B.W 3)Plastering
How will be cutting in timber plate size 600*400 column size