Answer Posted / s.anand
take sample before maintank bottom this coreact methode
Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
what are the range of memory address in plc for L&T lx7 4A
impliment (AB)`+C to transistor representation
Can you explain about Restricited earth fault protection scheme
we can run 2phase as 3phase .what will be the differnce with respect to phase angle, power, current between the two modes
what is the prosses for getting of 33kv licence (i have completed my engineering degree & working in 33kv substation for contract basis )????
in parallel operation of power transformer why the distance between power transformer and capacitor bank feeder is necessary to know
A car's starter motor draws a current of 100 A at 12,0 V when starting the engine. The mechanical power required to turn the engine is 960 W. At what rate is energy from the battery converted to non-mechanical forms of energy?
all details of DG UPS HVAC
what is the meaning of 5% droop or 7% droop in AVR?
What happens if we give the supply to the rotor of induction motor and make its terminal shorted?
will 1050kva DG set withstand for back charge of 16MVA transformer
TO CALCULATE THE RESISTANCE OF GRR OF HT MOTOR 400KW WHEREAS STATOR VOLTAGE 6.6KV AND ROTOR VOLTAGE 705V AND ROTOR CURRENT IS 346A.
what happen when increase or decrease size of lamp,light.glass.
what is the requirement regarding earthing of Single conductor with AWA
What is instrumental error?