What are the dimensions of
1)Standard Brick
2)Nominal Brick
What is the difference between them in terms of use ?

Answer Posted / r.sivaraj

9"*4.5"*3"

Is This Answer Correct ?    3 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to calculate the crushing strength of cement concrete paver blocks 100x100x60 mm thich.

1508


How to build the floor to ceiling bookcase?

838


What will be the exam pattern and syllabus for j.e post of haryana staff selection commision? Advt no. (02/2015) Some people says it would only be objective type question papers while others say it would be same as ssc (1 objective,1 conventional) ?? Please answer this question it is needfull to all.

1347


What is meant by a context menu in a cad software?

691


writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order

1504






qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor

1766


Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem

2332


how to calculate the concrete mix m30 by volume

1105


1.Fe500 and Fe550 having more yield strength than Fe415.But why are we prefering Fe415.? 2. d^2/162 formula for knowing the steel wt/m apply all these three? Thanks.

2725


How to Rectify deep crack formed on Brick Wall? Explain the method of rectify the defect?

6403


Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.

2378


What are the composition of a landfill?

693


by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)

1700


I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.

1530


In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.

3542