How do you arrive at the estimaton of efforts for a
particular function, if you have not worked on that
function testing before and do not have any past experience?
Answer Posted / barsa
In this case we always start with +ve values (test the functionality by giving +ve values)then we go for -ve values.
2.There is no assumption should be made for requirement .
3.Testing is over when test engg feels maximum test coverage is done,i.e all +ve and -ve values are tested.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Katari your questions was really helpful could you please send the questions and answers with them . Can anyone sends the top 30-40 question and answers for the interview purposes
MS Paint
What is your approach when requirements change continuously?
what will be verification and validation test cases for yahoo login page (only functional test cases)? Please explain in details.
Please can any one tell me 1).Types of reports 2).Types of Meetings.
which of the following is not a coding defect? Option 1 Test harness defect Option 2 Data flow defect Option 3 Initialisation defect Option 4 Algorithmic defect
What is difference between Build, Version and Release
Enlist some bug status along with its description?
What is mutation testing & when can it be done?
For any web application, what are the possible login features that should be tested?
How a test engineer will convince a test lead when he didn't approve the bug as a report ???
What is the procedure of manual testing?
online demo for bug tracker tool(let me know the website)
What criteria would you use to select Web transactions for load testing?
What are the various techniques in black box testing?