Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How to calculate the cement, sand quantity for plastering?
(10'x10')10mm thick ratio 1:5. wht"s the formula?

Answer Posted / harish po

100sqm,12mm thick,CM 1:4 plastering
volume = 100x(12/1000)=1.20 cum
Add 30% as bulking of sand=(1.2x30)/100=0.360 cum
Add 20% as wastage =((1.2+0.36)x20)/100=0.312 cum
Total=1.872 cum
volume of mortar=1.872/(1+4) =0.374 cum

volume of cement = 0.374 cum x 30 bag/cum =10.77 bag
10.77 bag x 50 kg/bag =538.5 kg for 100 sqm
(for 1sqm 12mm thick,CM 1:4 cement required=5.385kg)

volume of sand = 0.374 x 4 (CM 1:4) =1.496 cum for 100 sqm
(for 1sqm 12mm thick,CM 1:4 sand required=0.01496 cum/0.53cft)

Is This Answer Correct ?    3 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the worlds largest concrete dam?

1256


when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?

2166


If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?

1731


the magnitude of the buoyant force can be determine by newtons law of viscosity archimidies principal principles of momemnt none

2185


how to create our resume?

2184


Why Vitrified tile are getting pop up.

1047


what is the composition of good brick ?

1923


What is the difference between built area and super built up area?

1258


what is the effect of duration of earth quake on framed structures ?

2257


Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.

2115


Which brick is best for construction ,either fly ash or AAC BLOCKS

1023


what is Bearing Capacity,How to determine it?

1286


how to conversation of all construction material in to brass

5497


what does the track parameter mean in staad.pro?

6091


please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?

1559