How we can re-range the DP transmitter, range is -0.5 to 2.0bara. new range is -0.5 to 5 bar

Answer Posted / manikandan

Using hart

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

why we r opening HOT BYPASS valve during startup of a compressor?

1611


send me last 5 years questions asked in rrb chennai, for section engineer

1645


I want measure the volumetric flow of gas in waste heat recovery Boiler?Tell me how and which type of instruments required. Plz mail me:naba02222@gmail.com Sam please post the answer .

1564


What is difference between Ionization heat and bimetallic heat

1159


what is gas metering system? gas chromatograph? and gas compressors?

1974






why we are not using the turbine flow meter in the steam service?

1717


all questions related to instrument technician in any offshore oil and gas company.

20984


please can any one tell me clearly about pid tuning i am confusing about this .how to tune pid easly?

1698


A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.

1697


i am from instrument branch i want paper patern of mahagenco . any pevious years paper regarding my branch send me please . please.....

1617


Isometric drawings are generated during _________________ phase of a project

1624


What is the difference between PLC and DDC?

1683


I want to know about DDCMIS in detail ? please explain it. Also give name of reference books in which it is explained in detail in very simple manner.

3312


Explain the working of an enraf level gauge.

672


1)How many tpes of vibration probe and how many tpyes of vibration. 2)how we can calibrate a vibration probe with tk3 3)what is RMS value in vibration measuring application and how we calculate it.

1900