how to calculate 1:2:4 ratio concrete cement, sand, metal
and water please give me brief calculation
Answer Posted / laxmikant kirpankar
DENSE VOLUME OF 1 M3 OF 1:2:4 m15 Conc.=1.52m3 approx.
Ratio (1+2+4)=7
=1.52/7= 0.22m3 Cement required for 1m3 of conc
Proportion(1:2:4)
1 Part of Cement=( 1x0.22=0.22 m3 Cement required for 1m3)
2 part of sand =(2x0.22= 0.44m3 Sand required for 1m3)
4 Part of aggregate=( 4x0.22=0.88m3 Aggregate for 1m3)
Note: Volume of 1 Bag of Cement = 0.035m3
Hence 0.22m3/ 0.035= 6.28 Bags of cement required for 1m3 of concrete
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What is packing Factor ?
I want to know how much the lapping length for the pilecap reinforcement.. we r using single pile cap which is 24mby54m and 2.5m depth.. total 91piles are supporting the pile cap.. how to do a steel reinforcement??
What is the crank length in the slab?
Please Clear My doubt . We Can Design the size of the beam by manually by the Length of the beam...What is the technique adopted
What is GSB gradation
what is mean by reestimation?
How much quantity of cement Bag for block masonry (1:4) for 1 cu.m? Block size (150x200x400) Mortar Thickness 20mm
Define What is the meaning of a blue land surveyors flag?
please what is the number of bars required for a column of 6mx6m and 450mmx300mm,its a commercial building (Church)
sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you
115mm thickness brick work how to required mortar
How to do rate analysis for concrete work including shuttering work?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
is basic cost of the material includes tax?
how to absorb to site basic corrections? which are the important correction?