How to schedule counter base maintenance plant for DG in
power plant that need 800hr per month maintthis
steps i followed.
1)i have created meas pt with counter (IK01) created meas
document IK11 then schedule thru IP10.
but not getting due order list in ip24.
can any one help me by telling exact cycle.
thanks in adv.
Answer Posted / kalyan
please check the scheduling period for counter plan
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Is it possible to install an equipment to a functional location without data transfer from function location to equipment?
How pm module is integrated with fi module?
What do the cs03 tcodes in sap- pm mean?
When you mistakenly enter wrong master data for an equipment, how do you manage this?
Why do you need an equipment and functional location both?
What is maintenance plan? Name all types of maintenance plans.
What do the mb31 tcodes in sap- pm mean?
Suppose there is a measuring point for temperature and while recording the values of temperature there is a deviation of values from given limits? Is it possible to throw a warning or error message? What is the configuration setting available?
What do you understand by data transfer between technical objects?
Where do we use multiple counter maintenance plans? Explain with an example?
A reservation is triggered from a maintenance order and user is trying to issue material from warehouse with reference to the reservation. But system is not allowing goods issue? What I need to check?
What functions are determined by the category of the functional location?
What is purpose of construction type in equipment master?
Which t code can give you the list of all pending preventive maintenance order for the coming month?
Which table would you use to extract the equipment and class information?