Answer Posted / sandeep patel
first prepare I/O list, then do cabling from and to I/O modules. after cabling do Ioop checking and do programming as per requirement of process sequentional operation and then..then take trails...
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Sir, I want junior executive, Instrumentation question papaer for IOCL, Plz send to arabinda.ghosh83@gmail.com
What is Span Error
sir ,iam in dem urgent need of HPCL Paper of Instrumentation Branch plz send me at your earliest convenience at ujjwal_sharma1983@yahoo.com
Full form of KKS when use DCS.
1. For Steam drum level signal, why do we compensate with drum pressure signal? 2.For main steam Flow signal is comensated with main steam temperature signal and main steam pressure signal why?
what is the different between deflection type measurement and null type measurement in RTD?
Can anybody tell me which type of question are asked in the interview for the FORMULATION(Pharma) as a instrumentation engineer, & question in building managment system.
What is Positive Calibration and Negative Calibration?
why Fahrenheit unit of moistur analyzer transmitter
what is the imbustion control loop
draw the block diagram of a level transmitter ?
There are two chlorination tonners both are connected to two pressure swithes and the pressure switch is connected to SOV which operates the valve to changeover the tonner selection i.e if pressure one tonner goes low the other tonner should come in line if it is inautomatic selection design a circuit using relays ?
Why plc require in analog input 4-20amp & 0-10 volt?
selection criteria of control valve? and selection criteria of actuator explain in brief?
What is the use of GMV in turbine?