1 cubic meter contains how many bricks
Answer Posted / mohammed ayaz khan
Answer is 568 bricks
volume of each brick= length x Breadth x Depth
=9''(inch)x 4''(inch)x 3''(inch)
= 108''(cu.inch)
And convert to cu.m, we know that 1cum= 39.37'' (inch) so
108/39.37''3 (cu.inch) = 0.00176 cu.m
Then calculate the no's of bricks= volume of brick work/volume of each brick
example: 1/0.00176=568 bricks
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
What are the problems one might face while having a Cantilever balcony?
at what pressure ply-wood is obtained by gluing wooden sheets
Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.
what values & beliefs have guided you in your career path
How do you change a dimension value in solidsworks?
Explain major differences between routing maintenance and major maintenance.
Permissible wastage of cement as per IS code ? In which IS code I get it?
Define What is the meaning of a blue land surveyors flag?
how many type of admixtures for water stored structure?
for G+2 residential building how much quantity of required in foundations,sub & superstructures per sq ft area
What is the difference in painting using Roller and Brush? What is the paint consumption difference? As per IS one coat of painting is painting from left to right and top to bottom whether this can be done using roller ( Roller Stick height and feasibility) ?
A super elevation of 60 cm has been provided on a 8m wide road and a curve of 260m radius .calculate the max.speed in km/hr of the vehicle that can be negotiated safely? Plz answer with full solution.thanx
what radial pressure, the NP2 class rcc pipe can sustain?
Define What is passive earth pressure ?
a sewer which receives the discharge of no. of house sewer is called house sewer lateral sewer intrcepting sewer sub-main sewer