Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

At present how many HVDC lines are there in india

Answer Posted / chittaranjan behera

Here is the list of the HVDC Lines in India.These data might be useful for the electrical engineers in answering the questions during interview.Cheers !!!

HVDC TRANSMISSION LINES IN INDIA
HVDC LINK NAME DESCRIPTION ABOUT HVDC LINK
Vindhyachal Back-To-Back link
connects Northern and Western regions with 2 lines.Transmission Power is 250 MW and the Operational Voltage is 70 KV
Chandrapur Back-To-Back link
connects southern and western regions with 2 lines.Transmission Power is 500 MW and the Operational Voltage is 140 KV
Sasaram Back-To-Back link
connects northern and eastern regions.Transmission Power is 500 MW and the Operational Voltage is 140 KV
Vizag Back-To-Back link
connects southern and eastern regions.Transmission Power is 500 MW and the Operational Voltage is 140 KV
Rihand-Dadri
Maximum Transmission Power is 1500 MW and the Operational Voltage is 500 KV.It is a Bipolar Link of length 814 KM in Uttar Pradesh.
Chandrapur - Padghe
Maximum Transmission Power is 1500 MW and the Operational Voltage is 500 KV.It is a Bipolar Link of length 753 KM in Maharastra.
Sileru-Barsoor
The Transmission length is about 196 KM and the Transmission Power is 400 MW and the Operational Voltage is 200 KV
Biswanath Chariyali -Agra
It is a bipolar Transmission Line of length 1825 KM from Assam to Uttar Pradesh.Maximum Transmission Power 6000 MW and the Transmission Voltage is 800 KV.
Talcher- Kolar
It is a bipolar Transmission Line of Length 1376 KM connecting Eastern and Southern regions . Maximum Transmission Power is 2000 MW and Opertional Voltage is 500 KV.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

I have been using an 600VA with 0.6 p.f UPS with my desktop which has 450W power supply unit. Can anyone explain how can this happen . Because the output of the UPS is 360W (600*0.6) (<450W)

2135


what is proper capacitor placement? How to evaluate capacitor size?

2129


how can service sitting be setted for MCCB?Example for sittings IR (CURRENT RATING),IS(CURRENT STARTING)IO (current operating

2415


1. If 8.35%Z means the percentage impedance of 132kV-line from power company, we will like to confirm its base capacity?

1978


How many types of protection relays are there based on the characteristic?

1095


please give me solution to rectify the emi(electromagnetic interference)

1913


What is the direction of current flow in ct secondary...means if the current is flowing from P1 to P2 then what will be the direction of current flow in ct secondaryw

1898


How is efficiency of DG set calculated? At many places I found the efficiency to be mentioned in percentage. But at some other places I found kWH/ litres. I want to know how dimensionless percentage value is arrived at?

1921


hwat type of motor is used in thermal gas turbine hydro nuclear power plants and why

1895


why we use ac supply as 415 volts instead of 415 v why we cant apply 230 v for dc

2408


if the motor rated speed is 950rpm. how to change the above rated speed? is it possible?

1419


which type of amplifiers are used in multimete?

2213


we have provided 30 nos. relay contacts in panel.I want to know how do we do the numbering for the relay contacts as per any applicable standards

2012


How to resolve if Diesel generator stop while running ?

3111


What is the importance of counter based plan & how is it scheduled?

2017