How to calculate productivity of construction equipment
like excavator, dozer, rock breaker, riper
Answer Posted / mandar
i believe that the 75% efficiency taken is of operator then the rest taken is not applicable as it is included in the efficiency. As well the material swell factor and the bucket fill factor should also be taken in account plus the machine availability factor should be also accounted (generally less 85 to 95% considered).
Is This Answer Correct ? | 1 Yes | 6 No |
Post New Answer View All Answers
cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate
Design a built-up column carrying an axial load of 1200 KN. Its length is 8m and it is effectively held in position at both ends and restrained against rotation at one end. Assume yield stress of 250 mpa
What things you need to take care of before building a kitchen island?
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
how much used soil in 1 brick of standard size?
water leak detection system question & answer
What is command line?
How to calculate density of 40 mm coarse aggregate, in mixing ration 1:1.5:3? Please explain calculation for density
why +1 to be followed for calculating the no of bars in BBS. Please explain
As in practice, we are deducting every 2d for 90 degree bend but from where it comes means derivation or reference of IS Code.
material used for mendrel use to bend epoxy coated rebar
why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?
how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6
Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)
How can explode a block?