How to calculate productivity of construction equipment
like excavator, dozer, rock breaker, riper
Answer Posted / mandar
i believe that the 75% efficiency taken is of operator then the rest taken is not applicable as it is included in the efficiency. As well the material swell factor and the bucket fill factor should also be taken in account plus the machine availability factor should be also accounted (generally less 85 to 95% considered).
Is This Answer Correct ? | 1 Yes | 6 No |
Post New Answer View All Answers
difference between fc and fc'?
What is the average density of soil?
pls tell estimate for 1 kilometre length random rubble masonry 0.90 metre height 0.600 metre width
Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?
if mineral admixture add into concrete then what is the differences between full cement concrete & fly ash added concrete of their SP. Gr.?and for the changes of SP. Gr. what is the changes in concrete
what is the function of GSB all class ?
resins are not soluble in water soluble in spirit used in varnish left behind on evoporation of oil
How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.
How to do base isolation for RC framed structure using ETABS software?
what is Brest Wall?
crank types
pls give me ans to ACT formula cube testing porpuse
VAT and CST ? Which benefits for buyer ? Why benefits?
material used for mendrel use to bend epoxy coated rebar
One plate (women civil worker lifting Plate - Satti) sand measures how many cubic feet?