How to calculate productivity of construction equipment
like excavator, dozer, rock breaker, riper

Answer Posted / mandar

i believe that the 75% efficiency taken is of operator then the rest taken is not applicable as it is included in the efficiency. As well the material swell factor and the bucket fill factor should also be taken in account plus the machine availability factor should be also accounted (generally less 85 to 95% considered).

Is This Answer Correct ?    1 Yes 6 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

difference between fc and fc'?

1403


What is the average density of soil?

781


pls tell estimate for 1 kilometre length random rubble masonry 0.90 metre height 0.600 metre width

1210


Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?

1525


if mineral admixture add into concrete then what is the differences between full cement concrete & fly ash added concrete of their SP. Gr.?and for the changes of SP. Gr. what is the changes in concrete

1718






what is the function of GSB all class ?

783


resins are not soluble in water soluble in spirit used in varnish left behind on evoporation of oil

2282


How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.

1986


How to do base isolation for RC framed structure using ETABS software?

3830


what is Brest Wall?

939


crank types

1994


pls give me ans to ACT formula cube testing porpuse

2647


VAT and CST ? Which benefits for buyer ? Why benefits?

1486


material used for mendrel use to bend epoxy coated rebar

1956


One plate (women civil worker lifting Plate - Satti) sand measures how many cubic feet?

1969