How can get electrical "c" licence.I am complited in
Deee.Passing year of 1993.Working in pvt cocern lt
Line.Please advise me .Cell no 9994786021
Answer Posted / selvakumar.k
2014 b.E eee batch,i have worked in industries 500 kva transformer,2 years experienced in maintenance dept,then how to get c license ,kindly tell me sir,mob no:8754801506
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
From past few months I am getting lagging pf even though sufficient capacitors used in circuit. Where is the problem pls answer
what is RFCT and Insulgard Relay & It's function?
sir,in our plant we r using SATEC PM172E power reading meeters in HT panel side it is monitoring the MB data smart viewer(sever).but last one week we did not get readings inthe server only available in meeter.tell me how communicate meter and server. and also what steps we take for checking.
define hysteresis loss, eddy current loss and windage loss
Is it possible to make a 5P10/ CT Ratio 50/1A Burden 5VA
is it possible to turn on the single phase star delta on delay timer using 24 v dc ?
how to determine Sq.mm size of finolex power cables.
what is difference between isolation and ultra isolation transformer?, what is the method of testing ?
What is the difference between a 3 winding and 2 winding Potential Transformer
what is level 2 automation?
How much minimum insulation required between 11kv/3.3kv transformer windings?
difrent between vcb acb sf6 and mccb breakers
During underground cabling in landscape area what did we cover the cable with to prevent the electric shock & protect the cable?
Application Comparison between 22KV (UE)and 33KV (E) system. Are we allowed to use 33KV (E) cable in lieu of 22KV (UE) cable. What are the technical disadvantages.
A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.