What is meant by 'zero value' in quantity surveying.
Answer Posted / balakrishnan
Zero Cost is the actual cost of each activity, in which Over heads & Profits are not included.
BOQ rate is the price which includes Over heads & Profits.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.
is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.
Define What is aggregate?
What is 1/8 on the architect ruler denotes?
what is the use of steel rods of 16mm or 20mm used for 4.45mts for closing gutter.one mate consumes how many kgs with a gap of 6inches.
will fix foundation bolts at site with out template is there any procedure?
how to calculate the density for high density concrete ? or is it same as the density of RC?
the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum
what are the types of dimensioning?
Can inverted beams used in pipes during construction?
In the roof of a pumping station explain briefly the components of a waterproofing system?
What is specific gravity???
what is the dimensions of river sand truck trailer or trolly ?
List out the types of roofs?
Define What is Civil Engineering?