Answer Posted / joydeep dhar
Nominal cover means clear distance between face of concrete and face of main outer rebar, whereas effective cover means center of rebar to outside of concrete face, so Nominal cover < effective cover. viz. if 20 dia steel is used and nominal cover is 40mm then, effective cover will be (40+(20/2))= 50mm
Is This Answer Correct ? | 12 Yes | 8 No |
Post New Answer View All Answers
How to find permissible diagonal tensile stress in reinforced brick work
though u r a civil engineer, y r u interested in tcs???
how find the cut length of tringular ring and any formula find out the quantity of circular brick work
manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.
What is Joule Brayton Cycle?
What are the advantages of cad software?
what is called the inverd level of mabhole chamber?
What is portland cement
if dia of inner circle is 42 m and depth is 1.5 m and width is 1 m ,then whait is the quantity of steel?
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.
can i get hindi version of is codes based on civil engineering?
procedure for preliminary selection of size of column of 5 storey building
How to plan a project
What is the use of extend command?
What is oneside mat. And explain