Answer Posted / k.prakashchandra
The relay measures rate of drop in frequency ,which is due sudden increase in load or decrease in generating capacity . When df/dt exceeds the set value ,the relay closes the trip circuit.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
IN induction motor pf is increased using capacitors.what will be the effect on motor and system when very large capacitor is accidently installed and pf goes leading.
how did i get the competency certificate as electricle supervisor. iam completed my b.tech.but i dnt have any experince, this certificate is required for applyng ongc mangement trainees. what should i do sir please suggested me
what would u consider to be the basic purchase order information you would need to proceed with a cable inspection assignment?
If I have Energy Meter Ratio as 100:5 & Also I have CT Ratio as 50:5 then what will be my multiplying Factor(M.F.)
How one can check the MAIN of a house wiring ?
what is rating boiler
What is the Diff. btw Manule Pull Station & Manule Abort Station Switches used in FM200 System??
how much maximum load a 2 core (Single phase) 16mm aluminium wire can take ?
3Cx240 & 3Cx300 sqmm Al. cable from lv side. What is the calculation for this cable??
How can we decide cable size from HT panel to Transformer? Please give you reply with some examples.
For electrical designers what are the standard should know? i want learn about this standards. how to get information/reference. anybody help in this regards please.
1 “earthing” for bonding of equipment and circuits to common plant earth electrode potential, 2 “protective earthing (PE)” when this bonding is required for personal safety provisions 3 “grounding” for interference suppressing bonding of screens, sys-tems with ground level 4. low-impedance earthing ? 5.primary earthing system and secondary earthing system what is that? 6.earthing electrode or mesh net earthing electrode ? very confusing , simple but very informative help required ? i will be very very thankful to you guys.
What is your acheivements
why ahould you show client/engineer activities clearly on the project plan
i have applied for junior engineer 2 c&w for Guwahati RRB please send me last five year question paper