Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How to check it good or bad capacitor

Answer Posted / harishdarade563

Firstly check out the rating of capacitor you want to check.According to voltage rating given on capacitor, apply the voltage to its two terminals(Note :Do not apply the voltage more than rating voltage,otherwise it will make a short circuit,less voltage can be applied) and then short those terminals.if spark between terminals is observed it is good otherwise it is bad.

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to calculate Voltage regulation of 22 KV Over head Line.

1654


hi i have applied for lic of india south cenrtal zonal ,hyd. i didnt get hall ticket till now.let me know how can i get form internet

1996


I HAVE A 50A MCCB AS PER DESIGN LINE WIRE CONNECT UPWORD SIDE AND LOAD IS CONNECTED TO DOWNWARD SIDE TO THE MCCB.IF NOW ANY ONE CHANGE SUPPLY & LOAD(WISEVERSA) WHAT HAPPENS ? DOES MCCB OPERATION OR WORKING FUNCTION NORMAL IF YES THAN WHY THERE ARE MARKED LINE & LOAD ON MCCB.

2374


ho can we calculate the conductor insulation value according to their ratings like voltage,current etc.how insulation value related with voltage,current and power of amachine

2081


cc of scorpio?

2272


how did i get the competency certificate as electricle supervisor. iam completed my b.tech.but i dnt have any experince, this certificate is required for applyng ongc mangement trainees. what should i do sir please suggested me

1894


CALCULATE THE TOTAL VOLTAGE DROP AND SELECT THE CABLE SIZE IN MM-SQARE FOR A PANEL-262KW AT 110 METER FROM THE SOURCE SUPPLY , SUPPLY VOLTAGE 240/415

2642


What is the physical significant of power factor?

1912


In PFI plant one stage capacitor connection is directly connected(with out megnetic contact controll). but why?

2287


Explain the term parallel path in dc machin ?

2197


WHAT IS MEANT BY TV TERMINAL IN 500MVA TRANSFORMER?

2277


What is nyquist contour?

1176


(In MEP services) HVAC in AC Plant room what else can we provide if the chiller is not considered?

2037


How relay coordination has to be done? what are the inputs are required for this? Please explain this with calculation method?

1800


what sort of general awareness questions are asked in o.n.g.c entrance exam?????????????????