Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is coping?

Answer Posted / jobin

Coping is raising of parapet wall of terrace in order to prevent leakages from terrace. It is done by providing slope so that rain water could pass away.Coping is provided by laying R.C.C over the present parapet wall.

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

can any one explain bar bending schedule of bems and columns and slabs ??

1916


Define current ucs?

1428


Reinforcement details at hinged joint

3140


How much cum. Brick work can do by 1 madon

1654


can i get civil engineering test papers.......?????

2453


Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.

2972


how much need sand and cement for 1 cft roof construction?

4444


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

2445


kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com

1838


What is the difference between a wood shake and wood shingles?

1318


Doul Bar reinforcement and details of drawing.

2491


How to calculate material and labor required for 100 m2 plaster?

1830


what will be price of 1:2:4pcc per kg?

2088


What is the difference between chamfer and fillet?

1442


What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)