What is mean by ITP in a construction project

Answer Posted / mahesh rao

Inspiration and test plans

Is This Answer Correct ?    1 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem

2428


how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour

1201


Dear Frds, How can i calculate the Steel for RCC Slab, Please provide one Example also, so that i can understand very well. Ex: Area: 1320.0 Sft.(44' X 30') Span: 15'(Default). Column Size: 9"X15"(6 No.s 12mm Rods) Please Provide Calculation Details. Thankyou. Satish

2226


What is missing report and how to prepare

1113


What is the tallest man made structure in the world?

737






How to calculate quantity of cement , sand and granite from concrete mix ratio and volume of work

3240


what quantities of work done in terms of sq.mts/day/ of 8hrs for each varpenter (shuttering) and Steel fitter in terms of Tonnes. For slabs, Columns etc.?

1770


What is the difference in painting using Roller and Brush? What is the paint consumption difference? As per IS one coat of painting is painting from left to right and top to bottom whether this can be done using roller ( Roller Stick height and feasibility) ?

1094


how to prepare site mix design

1641


What is the compressive strength of fly ash bricks?

786


If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?

1833


Can compresive strength test for concrete at 1 day age possible to carry out? If yes, which IS code describes the procedure for such testing?

1685


i want texture painting pwd data

1739


mix design procedure for 1:6 cement mortar

1841


what is diffrence between catchment area,watershed and basin?

2597