9*9 1:4:8 ratio using how to calculate the material for
40mm aggregate ,cement &sand please tell me answer
Answer Posted / sanjeev kumar singh
Dear sir
1cum cement concrete me material quantity
.9 cum.aggregate
.45 cum. Sand
.12 cum. Cement
Right answer kya hai
Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
How much area will be covered in 1 litre of Velvet touch paint in normal wall condition
please what is the number of bars required for a column of 6mx6m and 450mmx300mm,its a commercial building (Church)
Rate analysis for construction of a solid block masonary of size 400x200x200 in C.M.1:5 in superstructure .Compressive strength 5.00 N/Sq.mm Confirming to IS: 12894:1990, with necessary scaffolding, raking of joints and pointing the same. I require rate per Cum.
How many bricks are there in 100cft?
Aptitude, reasoning, quants, verbal and technical question
Explain different types of rcc pipes.
What is the formula for figuring out how many gallons of water are in a pipe by the foot?
How we calculate the service time of buildings
the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum
What is Joule Brayton Cycle?
What is the difference between Grade I, II and III of GSB?
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
What the advantages and disadvantage of using 90mm and 100mm bricks for a wall of a house? Thanks for any input.
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
is there any influence of water(used for mixing of concrete) on a weight of harndend concrete.