Please tell me the difference between nominal and clear
cover. Thanks.
Answer Posted / suchith kumar
effective cover=the distance from centre of iron rod to the bottom of fibre.
clear cover=the distance from bottom of fibre to bottom of iron rod.
| Is This Answer Correct ? | 20 Yes | 6 No |
Post New Answer View All Answers
what is stressing
what should be the PCC ratio to construct a plinth of (40x40x4)ft...??also its estimated cost??
The mixture of different ingredients of cement is burnt at?
what else we can add rather than admixture in concrete to reduce the cement quantity?
what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.
Slab quantity
In a concrete grade C35A, C & A stands for what and equalent cube strength?
writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order
Can we use Polystyrene as a Bitumen modifier !! if so is it a good MS research topic ? and what type of laboratory tests will be conducted during Research work ??
Wats the formula of eccentric footing and how was calculated from concrete qty
Time required for curing of wall tiles before fixing
SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?
What are the strongest shapes in building?
What are the advantages of building a dam on the river nile?
For what purpose bedding is used under storm water drains, explain?