how to calculate rate analysis for column shuttering

Answer Posted / ajinkya patil

for 1.2x0.3 c/s and 3 m height

total shuttering area = ((1.2*2)+(0.3*2))*3= 9 sq.m

calculate total plywood or shutters required
a)cost of ply or shutter panels.
b)cost of supporting material required.
c)labour cost of shuttering.
d)labour cost of deshuttering.
e)jointing materials like nails & tie bars & other miscellaneous material


cost per sq.m= (a+b+c+d+e)/total shuttering area

Is This Answer Correct ?    26 Yes 7 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to calculate dry of volume of concrete constant?How it comes 1.54 or 1.57

1658


The largest size of paper used in plotter to print the drawing made by Autocad .

1391


undistributed samples are obtained by

2081


60-70 grade of Bitumen is VG-30 ?

1789


explain what do you mean by the property development.

1714






Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.

2279


How do you convert wind speed into force?

839


Give me an example of a time when something you tried to accomplish and failed.

2611


Define What is passive earth pressure ?

809


What is meant by autocad?

752


What is factor not to be taken in consideration in mix design?

3203


how to find out hard strata in bored pile when the DMC method adopted.

5514


plz drive the formula d2/162.162 for the calculation of weight of steel bars????

36844


How much for the BRC lapping in full yield and half yield < and which table to get it ?

2130


satart to end steps by step process of building construction...? i want to planning theme accuretly

1562