for 1.2x0.3 c/s and 3 m height
total shuttering area = ((1.2*2)+(0.3*2))*3= 9 sq.m
calculate total plywood or shutters required
a)cost of ply or shutter panels.
b)cost of supporting material required.
c)labour cost of shuttering.
d)labour cost of deshuttering.
e)jointing materials like nails & tie bars & other miscellaneous material
cost per sq.m= (a+b+c+d+e)/total shuttering area
Is This Answer Correct ? | 26 Yes | 7 No |
Post New Answer View All Answers
How to calculate dry of volume of concrete constant?How it comes 1.54 or 1.57
The largest size of paper used in plotter to print the drawing made by Autocad .
undistributed samples are obtained by
60-70 grade of Bitumen is VG-30 ?
explain what do you mean by the property development.
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
How do you convert wind speed into force?
Give me an example of a time when something you tried to accomplish and failed.
Define What is passive earth pressure ?
What is meant by autocad?
What is factor not to be taken in consideration in mix design?
how to find out hard strata in bored pile when the DMC method adopted.
plz drive the formula d2/162.162 for the calculation of weight of steel bars????
How much for the BRC lapping in full yield and half yield < and which table to get it ?
satart to end steps by step process of building construction...? i want to planning theme accuretly