How regularly you used to get the build and who used to installed build in software testing
Answer Posted / sadhana
once developer completed coding for particular module he will give build to test lead, the build can get within test cycle.
test lead will connect to developer server, copy the compressed file and paste in testing server, and he will test the application
the developer or test engineer or release engineer can install build in software testing.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What is the main use of preparing a traceability matrix?
What are the different ways of doing black box testing?
what is system testing? as test eng, what do u do in sys testing? who invoves in sys testing?
When should you opt for manual testing over automation testing?
Can Anbody please send me Daily Work status format in which I can save my daily work activity
Can anyone please tell in detail about the Rally tool and how a tester is going to use it.
After insert the record in front-end, how will you check the back end by manually? Please explain?
qtp9.2 and qtp10.0 difference
What is your Approach when you find 10 Sev-1 bugs in 50 test cases?
what is configuration management tool - send to thanu_santo@rediffmail.com. what is testing senarios
whats the reason to display the password(not in encrypted form) in the script in load runner but not in QTP?
How to write testcases for unread/read mails for gamil inbox? and what are the types of testing you do on them?
how many meeting in realtime environment? what are they?plz explain?
what are the templates for daily,weekly and monthly reports? plz reply ASAP.
Give me an example of something you tried at work but did not work out so you had to go at things another way.