Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

line safety is not opening but drum safety opens what to do?

Answer Posted / y v subba rao

Immediately we have to open the vent which was provided super heater outlet. The vent size should be such that it can draw sufficient steam from super heater to prevent overheating of coils due to starvation. We should keep it open till the minimum quantity of steam drawn by turbine. Mean while however drum safety will be closed due to pressure drop. Next we have proceed for line safety pressure setting.

Is This Answer Correct ?    4 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.

2279


im try to calculating seawater flow required for SW-FGD system. I need a guide, equation or method to do it, can some one help me! Thanks very much

1994


can dp type level transmitter work in under vaccum condition

1986


what is the trip circuit supervision in an electrical meaning?

2113


how to differentiate between "ALL fuel lost" and "All Fuel Lost" in Boiler MFT condition?

1693


Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon

2475


What is surging in a centrifugal compressor ? How it occur's ? How is antisurging done ?

2434


why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.

3246


what is natural frequency of turbine shaft .

2281


dear sir i have completed one year post diploma certificate in thermal power engineering from national power training institute durgapur ...plz suggest me for power sector job

2535


What is difference between secondary Air & Tertiary Air and Their use.?

1998


We have Demin Closed cooling water system with expansion tank for cooling oil system. Expansion tank having N2 bladder. Whenever N2 bladder bursts out, Closed cooling water circuit pressure drops and make-up happening, eventhough there is no leaks. And how Circuit pressure drops?

1910


what is restricted earth fault explain in details

2043


explain how the third harmonic content of the magnetising current affects transformer design

3266


what does mean by kva rating

1504