HOW we can calculate the quantity of sand and cement for 1:4
plastering with a thickness of 12 mm..total area need to be
plaster is 985 sqm

Answer Posted / eakub.molla

Total area=985m2
thickness of plaster=12mm=.012m
wet volume of plaster morter=985*.012=11.82m3
dry volume of morter=11.82*1.5=17.73m3
volume of cement=17.73/5=3.546m3
volume of sand=14.184m3
cement bag=3.54/.03542 bags
=100 bags.

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

660 square fit two story house make totally how much cement, sant, brick,aggregate, steel totally how much need

1109


while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.

1217


When column of building is abutting the boundary line,then suitable footing advised is

1963


what is zone a n zone b?why the spacing of ring in zone a less.n zone b high?

1564


Moisture content calculation for diff mix ratio's ??

1213






how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?

2137


why demand factor less then 1 ?

1777


how to compute slab reinforcements on step by step procedures??

4977


As in practice, we are deducting every 2d for 90 degree bend but from where it comes means derivation or reference of IS Code.

1436


TELL ME THE EQUATION FOR OGEE SPILLWAY

2177


What are the steps involved in the concreting process?

879


What is Heavy Concrete & Normal Concrete

2237


TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING

2105


What is portland cement

7130


1m square 20mm plastering how much of water need curing work

1463