HOW we can calculate the quantity of sand and cement for 1:4
plastering with a thickness of 12 mm..total area need to be
plaster is 985 sqm
Answer Posted / eakub.molla
Total area=985m2
thickness of plaster=12mm=.012m
wet volume of plaster morter=985*.012=11.82m3
dry volume of morter=11.82*1.5=17.73m3
volume of cement=17.73/5=3.546m3
volume of sand=14.184m3
cement bag=3.54/.03542 bags
=100 bags.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
In tower foundation, on the time of 3 mtr pit RCC casting if water and mud is their surface of PCC then what will be do?
What are the responsibilities of a construction manager?
In a concrete grade C35A, C & A stands for what and equalent cube strength?
The foundations are placed below ground level, to increase?
How to do base isolation for RC framed structure using ETABS software?
Which is the indian standard code of line out. ? How much tolerance fot 1 mt lenght? Its challenge....
what is the 0 value in quantity surveying
undistributed samples are obtained by
How many cum of 9.5mm stone in 1 ton ?
how to calculate detail quantity of bricks and mortar for 500 cu.ft masonry work. consider wall thickness 9 inches
04. a. Slenderness ratio…………… 1 b. If the height of a stage is 15-0 & dia. of the prop is 5, the slenderness ratio is….… 1 c. If the height of a stage is 10-0 & dia of prop is 3, the number of bracing will be…… 1
Detection of a beam & a girder are––––
How should we design a brick column and footing?(note: no reiforcement to be provided) Can you tell me any reference book where i could possibly find this design? Plz help urgently
What are the uses of alloys in daily life and how are alloys made?
Design a rectangular channel.