What are the deshuttering time for
Salb
Beam
Column
RCC Wall
Footing
Staircase
Answer Posted / md.khorshed alam
slab-14days
columan-24hours
beam bottom-7days
beam side-24hours
rcc wall-48hours
footing-12hours
staircase-7days
| Is This Answer Correct ? | 1 Yes | 4 No |
Post New Answer View All Answers
where can i get the previous question papers for rrb section enginerr (civil)
from where ican get sample papers for CET-delhi 2012
What is the difference between tor steel and tmt steel?
Pls provide me with the calculation or codes related to de- shuttering of flat slabs
what is the ingredient value of 40mm and 20mm aggregates?
How to avoid fly ash seed ball formations in the concrete mixer while mixing of raw materials for fly ash block manufacturing?
do we consider shrinkage factor for calculating cement consumption for CM mixes for different works?
Design a rectangular channel.
What is the significance of cost estimate knowledge for an architect?
the magnitude of the buoyant force can be determine by newtons law of viscosity archimidies principal principles of momemnt none
Hi how r u ? hope you are fine there . Please can u tell me tha Design life of Buildings as Per ACI CODE 318-99. It will be a pleasure for me .Thanks in advance
1:4:8 pcc calculation 591 cu.ft
what r the precaution for high in atp tempareture,low in atp tempareture
What is the use of mirror command?
how can calculate the compressive strength of concrete cylinder by water cement ratio ?