how many brick in 1 cubic meter with mortar ?
Answer Posted / aftab
cubic meter contains 500 bricks
The Standard size of the 1st class
brick is 190mm x 90mm x
90mm and motor joint should be
10mm thick
So brick with motor=200 x 100 x
100.
Volume of 1st class brick = 0.19 x
0.09 X 0.09 = 0.001539
cu.m
Volume of 1st class brick with
motor =0.2 x 0.1 x 0.1=0.002
cu.m
No. on bricks per 1cu.m= 1/
volume of1st class brick with
motor
=1/0.002
= 500 nos of bricks.
So 500 bricks needed(aprox).
Is This Answer Correct ? | 11 Yes | 1 No |
Post New Answer View All Answers
according to the painting co efficient, we should take the one side of doors (or) windows or both sides?
5. Do you feel that your present employer estimates your full work potential? Are they pleased with your work performance?
Types of column foundation and how to calculate its steel quantity.
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 600 microns?
it is possiblee to produce concrete with out cracks...
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
What are the different theories of failure under static load?
Which architectural movement is also known as jazz moderna?
How to measure the requirement of cement n sand for 12mm and 20mm plastering thanks in advance
what is tension footing?
material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water
why the cracks occurs in NP3 class Hume Pipe ? And what is bearing capacity of it?
What do you mean by honeycomb in concrete?
I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations
Rate analysis of 150mm, 100mm, & 230mm thk BBM work