how many brick in 1 cubic meter with mortar ?

Answer Posted / aftab

cubic meter contains 500 bricks
The Standard size of the 1st class
brick is 190mm x 90mm x
90mm and motor joint should be
10mm thick
So brick with motor=200 x 100 x
100.
Volume of 1st class brick = 0.19 x
0.09 X 0.09 = 0.001539
cu.m
Volume of 1st class brick with
motor =0.2 x 0.1 x 0.1=0.002
cu.m
No. on bricks per 1cu.m= 1/
volume of1st class brick with
motor
=1/0.002
= 500 nos of bricks.
So 500 bricks needed(aprox).

Is This Answer Correct ?    11 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

according to the painting co efficient, we should take the one side of doors (or) windows or both sides?

1310


5. Do you feel that your present employer estimates your full work potential? Are they pleased with your work performance?

8489


Types of column foundation and how to calculate its steel quantity.

1443


How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 600 microns?

6265


it is possiblee to produce concrete with out cracks...

1476






Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??

2234


What are the different theories of failure under static load?

727


Which architectural movement is also known as jazz moderna?

832


How to measure the requirement of cement n sand for 12mm and 20mm plastering thanks in advance

2427


what is tension footing?

1532


material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water

3252


why the cracks occurs in NP3 class Hume Pipe ? And what is bearing capacity of it?

2755


What do you mean by honeycomb in concrete?

709


I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations

1030


Rate analysis of 150mm, 100mm, & 230mm thk BBM work

7881