Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How to calculate the cement, sand quantity for plastering?
(10'x10')10mm thick ratio 1:5. wht"s the formula?

Answer Posted / ankit kumar

10 feet= 3.048m
Area=3.048*3.048=9.29m2
Thickness of plaster is 10mm or 0.01m
Volume of plaster = area*thickness
= 9.29*0.01
= 0.0929m3
Add 30% to fill up the joint,uneven surface etc
30% of 0.0929m3 = 0.027m3
The quantity of motar=0.0929+0.0279
=0.1208m3
Increase by 25% the total dry volume
25% of 0.1208m3=0.0302m3

Total dry volume= 0.1208+0.0302
= 0.151m3
For 1:5 sand motar.
quantity of cement=0.151/(1+5)
=0.02517m3
And for quantity of sand 0.02517*5=0.12585m3
Density of cement= 1400kg/m3
One bag of cement =50kg
Then volume of one bag cement=50/1400
0.0357m3
Now bag of cement=0.02512/0.0375
=0.67 bag i.e almost one bag

Is This Answer Correct ?    8 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How will you reduce the concrete flow after mixing the concrete

2132


how can we construct building without foundation providing only grade beam at ground level

1643


What does a construction cost covers and what does not?

1162


as per is code, what is the minimum content of opc and ppc cement for rcc structure

2209


what is diffrence between catchment area,watershed and basin?

2919


can any one explain bar bending schedule of bems and columns and slabs ??

1868


what is the 0 value in quantity surveying

2350


01. a. Diagram of a slump cone…………… 1 b. Size of Slump Cone…………… 1 c. Volume of a slump cone by av. Dia method…………… 1 d. Volume of a slump cone by av. area method…………… 1 e. Volume of a slump cone by frustrum method …………… 1 f. Angles of slump cone …………… 1 g. Slump measured by slump cone due to…………… 1 h. Slump does not measured by cylinder / cube due to …………… 1 i) ii) i. Slump cone is to be filled in……………………..Layers.

5565


cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate

1587


can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com

2461


If u want ur Ans.Of any Question so mail me skatiyar011@yahoo.in

1963


How much cement will require for 1Rmt Skirting laying

2261


Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.

2775


Volume of 25kg putty bag & 40 kg putty bag volume??

2012


how much is the maximum compressive strength of soil cement and soil-cement-microsilica .

2229