Calculate the cooling duty, H required to condense and cool acetone from 100 degree Celsius to 25 degree Celsius at atmospheric pressure. The heat of vaporization for acetone at its normal boiling point is 30.2 kJ / mol. The boiling point of acetone at atmospheric pressure is 56 degree Celsius. The flowrate of acetone through the condenser is 100 mol / s = N. Value of sensible heat needed to increase the temperature of acetone in liquid form from 25 to 56 degree Celsius is 4.06 kJ / mol. Value of sensible heat needed to increase the temperature of acetone in vapor form from 56 to 100 degree Celsius is 3.82 kJ / mol. Unit of H is kJ / s.
Answer Posted / kang chuen tat (malaysia - pen
Answer 13 : In the same state, total heat changes in heating = total heat changes in cooling for acetone. H = N ( total heat of sensible + heat of vaporization) = 100 (mol / s) [ (30.2) + (4.06 + 3.82) ] (kJ / mol) = 3808 kJ / s. The answer is given by Kang Chuen Tat; PO Box 6263, Dandenong, Victoria VIC 3175, Australia; SMS +61405421706; chuentat@hotmail.com; http://kangchuentat.wordpress.com.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
A shiny brown colored element ‘x’ on heating in air becomes black in cooler name the element ‘x’and black colored compound formed?
For amonia manufacturing process if pressure, temperature would be increase over optimum level what would be happen?And what steps should be taken?
MY generator water cooler inlet line height - 11 mtr inlet water line height - 7 mtr water come into the line from overhead tank, O/H tank height - 20 mtr the first tapping in the inlet line is 2" line which down to 4 mtr level plateform., second tapping in inlet water line goes to a pump 6" line installed at 4 mtr level plateform, pump capacity 200m3/hr, head- 30 mtr, hp-40. the outlet of pump of 6" water line connected to a header of 6 mtr long of 6" line, on this header the six tapping are connected, 4 nos. 3" line goes to 11 mtr height water cooler the pressure of the line is 0.15 to 0.25 kg/cm2, 2" and 4" pipe line connected to a cooler at 4 mtrlevel plateform. my question is, at 11 mtr height level the quantity of water and flow is not sufficient for my cooler, the temp. of cooler is rises much more. you are requested to suggest the modification of pipe line/ pump for take more water flow and pressure (desired pressure is 1 kg/cm2)
For what ration of Lengh/Dia. of tank (Jacketed tank), maximum heat transfer area is available?
Explain what are some common precipitating agents used to remove metals from aqueous waste streams?
Why is post-weld heat treatment sometimes necessary for welded vessels?
We are having proplem with the persperation smell in ETT/ECHO room in our cardiac hospital.The 2 Ton of AC is not conditioning the environment. We have to use exhaust fan to through out of the room bad air. Could anyone suggest how to coup with this effectively using chemical engineering. Any permanent solution to neutralise the bad smell.The Air freshners are not doing enough instead making a bad odour.
What are the effects of oils on the properties of Polyolefins?
Are there any methods of preventing cracking of carbon steel welds in refining environments?
Why does catalytic converter used in an automobile?
Explain how does a tank-blanketing valve operate?
What are some good estimates for heat transfer coefficients for coils in tanks?
Explain the largest application for surfactants?
What types of metals are typically removed via chemical precipitation?
What is % of piping & equipment cost for a chemical plant having batch process?