for construction of 1 cum of brickwork what is requirement of cement, sand and bricks
Answer Posted / ari kumar
500 bricks,20cft sand,66kg cement
| Is This Answer Correct ? | 1 Yes | 7 No |
Post New Answer View All Answers
why we can use dust in concrete insted of fly ash
How to find coloumn vertical cut length floor to floor & lap + bend or anything plz clearfiy
Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40
How to design staircase.plz tell me formula for the design the staircase.
What is the software used in civil engineering?
If u want ur Ans.Of any Question so mail me skatiyar011@yahoo.in
how u design STAGING for Superstructure in BRIDGE construction?
what quantities of work done in terms of sq.mts/day/ of 8hrs for each varpenter (shuttering) and Steel fitter in terms of Tonnes. For slabs, Columns etc.?
How about the temperature of grade 35A concrete? Does it depend on the ambient temperature?
Formula of area of crane hook
What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.
What is specific gravity???
what is meant by shear center?????
how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you
how to calculate quantity of bricks in circular manhole with examples.