What is a BBS?Find out the cutting length for a foundation size 600 x 600, cover 50 mm?
Answer Posted / arun
Length of steel=600
Cover=100
So = 500
if steel is 8mm then
500-2*.008* no of bends
Total Cutting length after deduction=.468
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?
what is the Purpose of Adding 20% of wet mortar & 1/3rd to Dry Mortar for PCC & Plastering & Rcc .is there any standard method for adding this .?
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
step by step procedure to find out the percentage of steel in coloum,beam,slab,footing in detailed
what should be the PCC ratio to construct a plinth of (40x40x4)ft...??also its estimated cost??
115mm thickness brick work how to required mortar
How about the temperature of grade 35A concrete? Does it depend on the ambient temperature?
What is the difference between Grade I, II and III of GSB?
What are the standard plastic limit/liquid limit/plasticityindex for differrent type of soils?
hi guys what happens if you are absent for a supplymentry exam?
2nd and 4rt angle elevation used in which country ?
In jack arch floor, the rise is kept?
what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)
How much percentage of brick bats allowed in CD-75 bricks
how to design and calculate materail quantity for concrete speedbreaker ?