two TG running in parallel at equal load.one TG CB tripped
in reverse power relay.after tripping found its excitation
was on & turbine running at rated speed.Please clearify why
that TG tripped in reverse power ?
Answer Posted / k.prakashchandra
You have not mentioned whether there was increase in speed of the tripped TG. If not, at the time of tripping the load on it was zero or it was running as a motor .
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
234 MVA Generator 3 phase Short circuit current Values required? Gen set Rating-234 MVA, Gen Voltage-18kv, PF;0.8, Xdv:23.5 %, Transformer Rating-18/380KV, 680MVA,Yndd1 two winding, Step up TR, ZT:35.50 %,X/R 4.33 Gen CB Position, CB open ,Disconnected open, Generator Running Voltage 18 Kv, Bi mistakes generator side earth switch Closed during that time short circuit current level in 3 Phase required, and how to test on site 234MVA Generator Short circuit current,
what is the function of choke in the flourcent tube lights and why the colour is in white mostly in flourcent tube lights
With a phasor diagram show the effect of increasing the field current of a generator supplying a constant real power and connected to a grid system.
What is the rating factor for copper cable ( Specific value according to the type of laying ) & the voltage drop?
WHAT IS THE DIFFERENCE BETWEEN AN ACB & mccb 7 WHAT IS THE CRITERIA WHEN TO USE WHICH OF THE TWO
why current flow to the opposite direction of flow of electrons???????????
salam&hi, i need to know about how can i calculate an enough current for the new building before i submit it to the suppliers
How to calculate LT XLPE CABLE for 11 kv / 433 v , 1000 kva oil type transformer system?
I need bhel electrical test pattern & paper
why the name trunking bus PT
What are safety device in vcb and acb?
how to select the no. of brushes in a lap winding?
how to calculate the power factor when instantaneous voltage and current has harmonics in it ?
one electromagnet is called
Dear all, i completed M.E(Power Electronics & Drives) 2011 passed out having 78% so i need job in core side but i don't know how can i receive the calls from electrical companies and i uploaded my CV in naukri, times jobs etc.. In that iam not recieved any mails from good companies so give me best procedure plzzzzzzzzzzzzzzzzzzzzzzzz..... Thanks, K.Linga Reddy Email-id:-lingareddykmthm@gmail.com Ph no:-08015402078