Answer Posted / pramila raj
The power value obtained by multiplying together the effective value of current in amperes, the effective value of voltage in volts, and the sine of the angular phase difference between current and voltage. Also known as wattless power.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
how to select rating of HT Panel
Circuit diagram of tube light without starter using electrical choke
A 7 storey building has a floor area of 35,000sq.ft on each storey. On the ground floor 11KV electrical sub-station is to be erected. A load of 3kw for every 400sq.ft (p.f is 0.8) is proposed for each floor. fire pump 7.5hp, water pump 5hp, lift 2 nos, each 10hp and 20shop load of each shop is 5kw. calculate a. load each floor b. total load of building c. L.T feeders for aech floor and from transformer to main. d. distribution diagram e. capacity of sub-station/capacitor bank f. line diagram
What happens if we run alternator on under frequency?
Which type of a.c motor is used in the fan (ceiling fan, exhaust fan, pedestal fan, bracket fan etc) which are find in the houses ?
what is the use of current transformer in power transformer secondary side.?its connectyed in WTI
What is the difference between vector surge relay (78) and Pole slip relay (98G)
What is the operating principle of turbo-generator.
What are the causes for the failures of sandwich type (Al) busducts?
send me any model test paper of clerical post of state bank of india.......
"TRANSFORMER MODELING AND ANALYSIS" MEANS WHAT AND WHICH TOPICS U READ IN THIS
one conductor length is L.and i am strech uniformly this conductor and made length is 2L.so resistance of this strech conductor is R=4R..but i want to know about area of stech conductor hows it become a/2..
what is sevice settings for mccb?How can be it setted?
how to increase or decrease speed in DC shunt motor by DC convertor
What are the Formula of computing Back up Time of 500kVA UPS with 4 Battery Banks, each bank composed of 43 pcs of Batteries 12V150Ah. How to compute the Back up Time of UPS? We have also 3X500kVA UPS running in Parallel same composition as I write above.