If a HV Underground Cable (13.8KV) is layed in the ground below 1.5 Mtrs and any building construction is done on the Cable route. IS this allowable or Not? What should be the clearance. As per ISO construction on HV cable route is safe or Not? Why? Can any body suggest the site for my question?
Answer Posted / ra
cables for 13.8 kv is consider to be medium voltage (not HV ) and if it is routed in cable duct so there is no issue.the purpose of cable duct is to provided safety to cable route.
in case if the cable buried in ground, executor of building construction should notify the client through technical query to solve the issue by technical way according to specification and standard.
in my opinion builder suppose to keep opening for cable routing
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How to do stting of vl250 siemens MCCB
What are the parameters of water ( Water quality )to be monitored in Centralised HVAC ( water cooler chillers )
how to check avr of dg set of 125kva
The shot circuit in any winding of transformer result? Explain
why we setting 95 deg and 105 deg in wti and oti of distibution transformer ? give the reson for that ?
please send me the L&T Emb. sys. placement papers and entire details of pattren
Why does curving the pole faces in a dc machine contributes to a smoother dc output voltage from it?
What are the advantages of thermal power plant?
draw singleline diagram of star to delta and dol starters
what does vector group Dyn11 tell us? also tell me how will u differentiate between phase lead and phase lag thru this vector group
No load tap changing transformer working
Please help me regarding my one concern. - During earth pit testing we noticed that the Clean earth pit and dirty earth pit showing continuity (Resistance value - 5ohm) . I want to know that if both earth pit have separate location and there is not internal looping between PIT then why such continuity is showing on it . Because of this issue the field side all earthing point showing short. In PLC panel we are providing two types of earthing cable which is coming from separate earth pit (Clean and Dirty earth pit) because of earth PIT showing short our PLC is not complying spec . please help regarding this issues.
What is 11 N1 and 12 N2 in single phase Transformer ?
what is the effect of power factor of machines in starting current
There are different classes of protections in power plants.class a,b,c are clear..is there any class d and e r there..and elaborate class b protection.