It's depends on exposure condition and it varius from condition to conditon genreally
Slab= 15 to 20 mm
Beam= 25mm
Column=40mm
Footing=50mm
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2
Discuss some applications of modular elasticity?
In tower foundation, on the time of 3 mtr pit RCC casting if water and mud is their surface of PCC then what will be do?
When was the first motorway built in england?
can i get civil engineering test papers.......?????
how to workable concrete cube test M-25 design mix
how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?
what is the cost difference of a same structure when it is constructed with brick masonary and when it is constructed with block masonary and concrete as a frame structure????????????????????????
Can we apply curing compound on ceiling (slab Bottom)
how to caliculate required amount of cement and sand required for 1cu.m.
Why nautical mile is different from statute mile?
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
Describe a time when you anticipated potential problems and developed Preventive measures
which has high compressive strength between hollow block and brick masonry?
crank types