Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is the working principle of sox, nox analyzer?(opacity monitor)
Otherwise how to measure the sox,nox?

Answer Posted / roshan t

SOx NOx meters have one reference gas cylinder on which first they calibrated then sample gas passes through this analyser where SOx gas volume measures against voltage in m3/kg or in ppm
also if u want then multiply m3/kg by 24.75 and divide it by its molecular weight u got ppm value

Is This Answer Correct ?    14 Yes 12 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

ORP sensor working principle?

1963


What is the calibration procedure of Drum level transmitter if range is 0 to -400 mmh2o in lab?

2066


Why does a pressure gauge installed on reactor, doesn't have any vent line below to release the pressure? Is it any kind of designing mistake or it actually does not require any vent line? And if it does not require any vent line below it then how we are gonna release the pressure built inside the pressure gauge?

2126


please send the drdo exam paper

2336


A DP transmitter is used to measure the level of an open tank. The drain line of the tank is connected to a control valve, and is configured as, if the level of the tank is 90% the valve should get open 10%. And if the tank level is 10%, the valve should get open 90%. Draw wiring diagram and explain how to configure DP transmitter and control valve using HART communicator. If the span error at output is 1%, what will be the %opening of the control valve at 60% level of the tank?

1340


Boolean algebra

2118


State bernoulli’s application.

1089


Can any body tell me about SAP MAINTINANCE MODULE. WHAT IS its function and application. And study material Source about it. I shall be very thankful.

2013


why orfice is not used for main steam flow calculation

2057


Why humidity limit is 30 to 55 % for raw material storage?

4214


what is interlock system and why we use of this?

1962


Hi i am aneesh, done btech in applied electronics & instrumentatiin. And then i took mba in finance & marketing.After that i got placement in finance co and worked there for 3.5 yrs.Now i wanted to come back to engineering job.But without engg experience, i may not able to find an opening.i have done a course related to flow meters and ite calibrations. Kindly suggest where should i try to get a job?

1966


please tel me the calibration of pneumatic controler.

2107


Name different parts of a pressure gauge. Explain the use of hair spring in the pressure gauge.

1046


how to calculate signal cable sizing? and multipair cable sizing??explain in brief?

2304