Answer Posted / chinmay kumar patra(npti)
In case of high pressure turbine specific volume is less so less space is required.Singe pass design is satisfactory so no need of reduce the size by double pass designing.High pressure is maintained at outlet by using 1 or 2 impulse stage at starting stage so after reheating it must be able to reach up to last stage fr high work done.So high pressure at O/L of HP turbine is needy.So single pass design.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
explain how the third harmonic content of the magnetising current affects transformer design
By any way can we increase the B check hours from 300 to 500
why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.
What is LB-SR.
what does mean by kva rating
What is difference between secondary Air & Tertiary Air and Their use.?
How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.
why do you consider yourself a suitable candidate for this position
Looking for Bently Nevada surplus 3300/52-01-00-00 Reverse Rotation Monitor , 4 pieces.
what's the moog valve
what is the basic use of power plant in equipment
what is restricted earth fault explain in details
what is the difference between compensated & normal drum level in boiler drum?
how to differentiate between "ALL fuel lost" and "All Fuel Lost" in Boiler MFT condition?
What is surging in a centrifugal compressor ? How it occur's ? How is antisurging done ?