Answer Posted / biernder singh
AC always rated in tons because it designed on the basis of quantity of "heat removal" from room.quantity of heat is termed in tons means if an AC IS ABLE TO REMOVE 1000 KILO CALORIES in an hour that AC rated as 1 ton.
1 ton= 1000 kilo calories
=4120 kilo joules
=12000BTU(British thermal unit)
if you want to know of the power rating of AC then use it formula given below
1 ton =3.516852 KW .
for example 3 ton
3*3.516852 =10.55KW.
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
what are the advantage and dis-advantage of 3 phase 4 wire energy meter?
Define open loop control system.
how to select the automotive wire size by mathematical calculation. for xenon headlamp with ballast. the ballast given data voltage 10-17v,current permenant 6amp, run up phase is 15amp, peak at swicth on max 400micro sec is 40amp.the sum of cable resistance is 150mohm.please provide referenc document if any for relating the peak at switch on current,time & wire wire size
If we want to change a contactor of faulty one what are the conditions want to fullfil
Define phase cross over?
what are different types of electrical windings? i know the distributed winding ,concentrated winding etc but i want some detailed information, in what condition we will use distributed,concentrated windings what are the difference between them which is best, how induced emf changes by using different types of windings 20 hours ago - 1 week left to answer
how can we save enegry by using VFD for Resiprocating Air compressor which is having more unloading running hours
What are safety device in vcb and acb?
what is motor capacity of 80TR chiller? and also say what is the formula related temperature, motor capacity, TR?
For the requirement of a furnace of temperature range up to 1200 oC using silicon carbide rods, What is the required rate of transformer needed (please do it with all details)?
What is the minimum underground tank size capacity considered for firefighting purpose?
what is mean by D.O. in distribution line poles?
What size cable (based on voltage drop) is required to supply a 40 A three phase boiler if the wiring system is 75V single insulated cables installed in non-metallic rigid conduit 56m from the main switchboard? Voltage drop in the consumer's mains is 8V.
What is the Surge suppresor? Why using in a UDB's and How it works?
What is installed in PAC that is control the humidity