What is meant by 'zero value' in quantity surveying.
Answer Posted / sameer kashmiri
The difference of initial estimated cost and final estimated cost or Actual cost should be zero or near to zero.... its called ZERO VALUE
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Explain why concrete barriers have curved surface profiles?
What is the Tor steel Consumption for residential building G+24 footing (thum rule) ?
What are the benefits of rcc pipes over steel designed pipes?
How many Sft of Level Plaster per Kg
What is the Null Point of chimney in Power Plant
what is a well
Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?
which is the cheapest type of flooring (say for using for 6 months in a factory building & dismantling it)?
what is civil all interview questions
What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m
Dear Sir What is the Contraction joint for base Slab
calculate the quantity of cement ,sand,bars and aggregate used for 28*4 ft with 4 inch (125mm) thick
What should be the standard roof height like to be?
The largest size of paper used in plotter to print the drawing made by Autocad .
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.