Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what do u mean by 2/3 soleniod valves?

Answer Posted / bhupendra singh

This is totally wrong answer because 2/3 is not correct ,3/2 is correct. First digit denotes way and second digit denote Position.In any cylinder maximum two position possible first is Open and second is close,no chance for third position.If create third Position that means this will be middle if this position have that means the cylinder is jammed.

And way means Input,out put and Exhaust ports

Is This Answer Correct ?    7 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Draw a great bridge circuit.

2014


Im having problems with interfase betwen SPI v7.0 and SPPID v5.05. Previous versions of Intools shoul be fixed with SPPIDproj.ocx file. It was necessary to replace this file with one that allows the connection between different versions of SPPID. It is necessary in the current version to do the same?Thanks

2309


what is effect of specific gravity in differential level transmitter , explain formula related with this .

1650


can anyone tell me about the basic concepts to consider before to start a PLC panel wiring

1933


Specific gravity.

1873


What is stripper & spilitter ? Diffrence in this.?

2481


How to Calibrate Temperature Switch in field

1312


send me model hpcl questions pleas..........my mail id mohideen.dharvesh@gmail.com

2215


How addressable fire systems work? Pl. send details with architect.(Loop), also send details regarding Gas system. Pl. help me.Thanks

2100


can u plz send me technical questions asked in SCHNEIDER ELECTRICAL technical paper?

4731


what is difference between HOT permit and cold permit

2197


Any body have know try work calculation ???

1430


Tell me the field calibration procedure step by step with diagram of pressure gauge, pressure switch, pressure transmitter, temperature switch, level switch, flow switch, flow transmitter.

3210


when placing a vent or drain hole on an orifice plate should you measure from the center of the bore up or down for the vent placement?

1762


sir, i preparing hpcl,ongc,barc,hal exams(instrumentation engg)pls send a placement papers

2329