What will happen if the Air Preheater is placed before the Economiser?

Answer Posted / anbu

May be coal consumption is high. And the major issue is that the temperature of flue gas may reduced to below the acidic dew point then the tube erosion will occur in economiser coils and ESP also will disturb like lesser efficiency due to low charging performance.

Acidic dew point means that, H2So4 phase change occur from gaseous state to liquid state.

Is This Answer Correct ?    9 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is difference between secondary Air & Tertiary Air and Their use.?

1474


Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon

1765


How do you consider that you can improve and what assistance do you need to achieve this

1332


what is the trip circuit supervision in an electrical meaning?

1439


explain how the third harmonic content of the magnetising current affects transformer design

2770






dear sir i have completed one year post diploma certificate in thermal power engineering from national power training institute durgapur ...plz suggest me for power sector job

2070


We have Demin Closed cooling water system with expansion tank for cooling oil system. Expansion tank having N2 bladder. Whenever N2 bladder bursts out, Closed cooling water circuit pressure drops and make-up happening, eventhough there is no leaks. And how Circuit pressure drops?

1426


What is surging in a centrifugal compressor ? How it occur's ? How is antisurging done ?

1936


can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525

1277


what is the basic use of power plant in equipment

1225


what is the meaning of SST300 V56A in SIEMENS turbine

3883


procedure of how to generate power in solar plant.

1375


LAPT working in alternator / generator

2543


why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.

2761


Looking for Bently Nevada surplus 3300/52-01-00-00 Reverse Rotation Monitor , 4 pieces.

2976